I am lucky enough to have access to some heavy equipment on the weekends if I need it. IE: bobcat excavators things like that. My question is this.

If we come a bad dry summer again and I have 10 to 15 feet of my shoreline showing what would be the best plan / way to make my shore deeper? I have read that best case is having a 2 foot drop or close to it right at the start of my shore. I guess my thinking would be with the Bobcat Excavator get near the shore reach out as far as I can, and start to scrape along with the bucket? I may not be able to get it 2 foot deep at the start but it would be better then what I have now which is 2 inches deep at the start. Any suggestions on this or videos you could point me to would be great!

Thanks for any responses,

Last edited by RC51; 02/01/12 04:12 PM.

The only difference between a rut and a Grave is the depth. So get up get out of that rut and get moving!! Time to work!!