IMHO the cost is made up of building the dam, with good clay soil, the hardware and piping, then clearing the land where the pond will encompass. The size of the pond is not how it was quoted for me. The topography determines the size & depth (uless you have them dig it out, in which case your location for the pond is questionable) of your pond. Otherwise, the $ you were quoted sounds about right to me. Interesrlingly enough we saw ~ 50% reduction in the cost quotes from 2008 to 2011!


- Dave
4.5 acre woodland pond constructed Feb 2011
- began fill Aug 25 - full pool Nov 18
- fish stocked Oct 25: 1200 Shellcracker; 3800 bluegill bream; 500 channel catfish
May 2012: 500 LMB May 2012; 50 "permitted" sterile grass carp.