I'd planned to pore Pilings for a bridge using concrete cardboard tubes. I hit water at about twelve inches below the surface. Do I use quickcrete without water until it fills and then fill the rest of the tube with concrete mix, or do I let the concrete harden up to surface level and then later pore the concrete/water mix on top? I need help!