Heres another one I thought turned out good. We widened the driveway with 16 ft of 30" concrete pipe and dug it down to 12 ft deep any deeper in this area and usually you find sand I expected the same here since the bottom never firmed up. It had 6 ft of mud in it which was dry enough to smooth out in just a few days which is not normal.