I Currently own 5 Acres, but I'm securing the other 20 acres as we speek. Theres alot of dirt to remove I know, but the man I bought the place from owns a sand and dirt-pit Co. So in the contract he has to remove 3 acres of sand from 3'-20' deep. That water you see is actually at the fresh water table for my area. So these will be excavation ponds. If I get the other 20Acres I'll have him contracted to do another 3 Acres of water. I figured for the price, with a 3% interest note, ponds included. I should start living the dream. Is there any difference in managing an excavation pond than a water shed pond?