Well we been trying to work in this mess! Leave it to me to build a cabin the year we have had more rain than in the last 20 years!
Heres what we got done though.
Starting to work on the inner sill and center beam.
More sill work here. At least is was nice for a day or so!
We decided to hang brackets boards on 16 inch centers.
Inner sill all the way done! Still need to do the outer sill later, once all 2x10's are in place.
Started laying down them boards for the floor! We decided to go with 2x10 not 2x8 for a little more strength.
We put some 7/16 inch OSB board strips on the bottom of the 2x10's and up and down the sides of the sill so we can lay down 16 inch wide OSB subfloor and put our insulation inside of it before we put the real floor down. This way it is also easy to get at from underneath if I have to. Just lift up and move the subfloor over to get the any line I have to get at.
We got a little over half the floor boards in and mother nature came a calling! So we tried our best to tarp things up. Man it just keeps raining here!
Well that's it for now. Didn't get as much done as we would have liked due to all the rain, but we did get some done and that's what counts. I can't wait to see the sun again!
Last edited by RC51; 05/02/1101:30 PM.
The only difference between a rut and a Grave is the depth. So get up get out of that rut and get moving!! Time to work!!