Got the core dug on both sides of the creek out this week. Had to go 16'. These pics are after the backfill with Carolina red clay dirt. The spillway is what's on top of the hill where most of the clay for the core is coming from. Once we get the through pipe laid, we'll divert the water from the creek through the pipe and continue with the rest of the core below the creek, then building the dam.
- Dave 4.5 acre woodland pond constructed Feb 2011 - began fill Aug 25 - full pool Nov 18 - fish stocked Oct 25: 1200 Shellcracker; 3800 bluegill bream; 500 channel catfish May 2012: 500 LMB May 2012; 50 "permitted" sterile grass carp.