attach foam flotation to the bottoms of the flooring framework; set small charges at the remaining supporting poles and blow 'em all at once.
(don't forget to hinge the gang plank)
-
in lieu of the charges, wait for the water level to come back up and methodically disassemble/remove the supporting metal framework