Here is an update on the aeration system. I had the electric company put in a pole and another meter for the future dock area then I rented a hand trencher(never do that) trenched two feet deep four hundred feet through rock. Buried the conduit. Built a platform for the cabinet to set on that is hopefully above the flood plain. I used the tiger clasp system the same as brettski and was very pleased with the results. Hopefully the electrician will finish on Monday and Todd Overton will do the install on Friday or Saturday.

