Yeah if need be i believe I could do that. I got the electrical ran and installed today but it was brutal outsdie at 101 degrees and 84 percent humidity! So i did not get as much done as i wanted but I do have a post and electrical at the pond and working so the hard part is over!! I am still waiting on my weighted hose from Ted and I am going to keep looking around for a fuser yet. Surely I can find a dual with a little higher CFM range. Thanks Esshup for your help!
The picture below is the end result. Not a very exciting picture and I think I got my pvc a little off center

But at 101 degrees I was lucky to have even got it on there at all
