20,000 pounds of Bentonite chips showed up this morning along with a JD bulldozer. Now I only nee the operator to show up. He is suppose to be here in the AM with the trackhoe. Looks like we are ready to start the repairs. Figures rain in the forecast for all of next week.
Here is what the pond liked like today, fully drained
![](http://i290.photobucket.com/albums/ll243/lassig/pond/before%20repair/facingnorthsmall.jpg)
Larger version here
http://i290.photobucket.com/albums/ll243/lassig/pond/before%20repair/facingnorthsmall.jpg