Thanks guys, Easy Way Plastics looks like a good supplier too. I do have one more concern. I want to be able to drive accross the dam occasionally with my pick up truck. Is this schedule 40 PVC strong enough for that if it is buried say two feet? Should I put something on top of it to spread out the load? Should I bury it three feet at the top? I definately do not want to break my new drain.