So, the dirt work is about complete. I have just a little more depth to get and then make sure that I have it level accross the top. I also need a little work on ensuring that I have a 3 or 4 - 1 slope and then I will be digging a trench around the perimter to anchor the lining in. Should be through with depth, leveling, slope, and trench this next week. I have some pictures to share but not being a computer wiz I am having trouble with how to post pics? I'm sure someone else has had the same question so if I could get pointed in the right direction I would appreciate it.