...it seems the inventor in Rockytopper never takes a day off:
...just add a few more piers and some walls and wa-la a cabin on the water.
C'mon RockyT...I promised the boss we would take a break after we finished framing it out. Besides, I'm thinkin a small houseboat might look nice tied up to it AND meet all the immediate camping requirements...once we see a bunch more water

.
-
-
Well, 9 more yards of concrete and pad number 2 is poured and completed. This gives us 12' x 62' of launch. I figger the apron at the top will come in around 8 more ft of length.

We stole a couple of 5 gal buckets-worth of concrete out of the end of the pour to set the strainer support rod on the intake end of the dry hydrant line. I'll post pics on that with the balance of the
dry hydrant installation pics. Oh yeah, and talk about a close guesstimate of required concrete. I wrestled with ordering what calc'd out to exactly 9 yards, or order 10 and not sweat it. Well, I went with 9 :rolleyes: . We had about 4 more feet of the pour to go to get to the top and the driver gets out and climbs up to look into the barrel...this can't be good. He shakes his head and says it's gonna be close. Well, we finish the slab pour (barely) and he swings the chute over to my 2 five gal buckets staged off to the side. We got exactly both of them filled by me using the shovel to scrape out the chute. Not another pebble more. Poifect...I used the buckets to fill the hole for the dry hydrant support rod; end of story!
-
-
A little lunch break, and back to the green treat. We put up the last 2 pc of 2 x 12 x 16' for the roof supports. Then we set the 2 x 10 x 14' floor joists by toe-nailing them into the 2 x 12 x 16' supports with #10 x 3" stainless screws. Then, we set blocks between the floor joists and screwed them thru the joists with the same screws. The resulting floor framework is solid.
-
-
OK, time to go back to the dock and tie the whole shootin' match together. We laid in the last 2 x 8 x 10' stringers. They span from the 3rd concrete dock support to the deck we just completed framing. The attachment to the deck is with the same size/type stainless steel joist hangers we used on the beach pier with the same type #10 x 3" stainless screws for fasteners. There will be a small step up from the dock to the deck...it was an engineering issue I had to accept...not a real biggie. Anyway, it came together well.

-
-
We'll see how the boss feels about spending her last day of vacation. She's probably thinking R & R and maybe dinner or lunch at a nice restaurant. I'm thinkin' "stackin' tire pyramids and settin' PVC trees". There must be a reasonable compromise....?
-
(edit; a day later, the reasonable compromise was a nice picnic at the pondsite AFTER wrestling with old truck/tractor tires and assembling PVC trees. I gotta think I got the better end of the deal :rolleyes: . For details, spin off to the