My plan is to test it, ESS-13 and have a control pond, all in the same former pond shell. Since I will start with the ponds dry I can pretty much use any product and any application method I want. I need to partition the former pond with compacted clay, so I don't get cross seepage. I should be able to determine that by filling one pond at a time. I have managed that successfully before with the same soil so not too worried there. I hope to get similar evap as well, even if I have slightly different surface area on the three ponds. Might be educational to say the least.
Last edited by The Pond Frog; 02/27/10 11:45 AM.