Yeah, you remember Otto I've got the place outside of Moore Station. You recall I could fill the barrow ditch and widen the berm as well as increase the height. I'm considering this project in that the wetland has not been too succesful in bringing waterfowl. I like to bass fish. Could buy a lake lot or build this pond. The low water crossing was successful and I now have plenty water to this location(at least as described above assuming that's enough)An aside project would be to build up a road bed across a low area with spoil dirt starting almost at the edge of the pond. Dump then push, dump then push. I think you're trying to tell me something; 1666 per acre foot divided by 12 yard truck 138 loads divided by 3 an hour equals 46 hours per acre aprox. one week per acre? 18 weeks plus some dozer time? Give or take 1500/day? 7000/week? some economy of scale 100,000 for project?