Should probably have initially put this in renovation as that appears to be what it has become. Greg came down on 14th and gave me some good info and ideas. Dropped lake another 2 ft on 18th, contractor busy building BG beds, and yesterday added all PVC structure I had made up. At least seeing the entire lake now I have lot better idea of what I'm deally with and where and what structure to add.

This is bedding area added near head of lake, waiting for some drying to move mud, soil and muck excavated to get access to add sand.

Had no idea this little island existed these beds are @approx 6 ft. Wish could add to this but not accessible by tractor. Added 3 PVC porcupines on this.

Rock wall installed ready for sand

Same bed as above with sand installed. this will be largest area and sits in SE corner.

Additional small area could get access to and added small bedding area. Larger area is to left but photo is blurred will retake and post tomorrow. also added 8-9 stumps along dam for structure.


Lamar