Originally Posted By: esshup
Brettski:

How many trips using your trailer, or would you have them delivered?

one per trailer load ain't cuttin' it
It would have to be a tri-axle job. I know a guy that would run 10 of 'em at a time. Guesstimate about $150 - $200 for dely. Add in the track hoe cost and the plan evaporates into an empty bank acct.
(sigh)