150 p/h excavator 100 p/h dozier , no idea on the big dump never asked. 2.00 to 2.50 per cubic yard of dirt. The pond should have been around 40k+ but with the timber cut and used for the pond cost total will be around 25k give or take some. Not including pipe and valves which were around total 3k. Yea alot more money than I first thought is going into this pond but it could be much much worst , like having to haul in dirt. Of coruse now if Greg Grimes will give me a cut rate deal on his fish ( HINT! HINT!) he might get some free advertising

j/k Greg.