It's really cool except when I get the weekly bill... It's all I can do to stave off project creep. Now we're talking about another levee on the south end and a 36" pipe to handle the main flow of runoff. This will enable them to use the lake dirt and build a road around the whole lake. His idea is good - a raised road with 6" PVC pipes every so often so runoff from the hills doesn't flow over the road but through the pipes.