We hit Menards Wed night and loaded the trailer with 2 x 6's...again. It's time to head uphill.
-
There will be 2 shed dormers at each side of the 2nd floor. The structure is 44' deep and the shed dormers are 36' of it. We fab'd the entire 36' wall while it was laying flat on the subfloor, including cutting open the window openings and wrapping it with the housewrap. Much easier. The wall jacks got put back to work and up she went.

-

-
We framed out the opposing wall.

-
The rain arrived and it was time to call it quits for this weekend.

-
This wall will have to wait for the next trip. I imagine we will come back with another trailer load to 2-by stock to prepare for the end wall sections. I am encouraged by the thought that those 36' shed dormer walls are the final link to installing the roof trusses.
-
-