1) They never gave you a cost up front on the bridge, and from the sound of things, it was implied that it was part of the free dirt deal.
2) They buried concrete without your permission, which wasn't part of the deal.
I wonder what it would cost to dig up ALL the buried concrete fill in the holes and level the ground?