Latest update. The construction company has now removed over 20,000 yards of dirt and still need more. I told them that I didn't want any more dirt removed unless they paid for the water well to run for eight months. They agreed to pay for the water well to run for eight months, build a long bridge out to the dock, buy me hay, put about six dump truck loads of topsoil off of my property at the front gate, dig me a cattle pond, and reseed the grass. In return I have agreed to allow them to put their chunks of cement into the pond in the shape of a teepee and remove five to seven thousand yards more of dirt. Right now it seems like my entire place is torn up. The good news is that my pond is only about three inches low even in this 100 degree plus heat. The water well seems to really be helping slow down the summertime drop.