Page 4 of this thread spends alot of quality time discussing the need for some areas of rock to enhance the SMB spawning experience. Well, I finally got about 18 tons dumped today. We are about 30" from from full pool. The clock is ticking loudly for me to back a truck down to the shoreline without risking getting him stuck. We have had about a week of no rain. It's now or never for the last accessible area of reasonably shallow slope. - - Donna-ski sits on the beach pier framework as we wait for the first truckload to follow the perimeter road around the pond to where we are. The row of orange flags is the normal pool shoreline. - - I opted to pay a little bit more for freight and bring the rock in on a smaller single axle truck that carries 9 tons. We had better control on splitting the dump and sweat alot fewer bullets as he backed down the slope toward the soft shoreline. - - I took 2 loads, total about 18 tons. It was spread out over about 50 feet wide in piles. We were able to get the line to run from the shoreline, and angle it downward to about 2 feet deep at the other end of the 50' long rock reef. - - A couple of the piles are too tall and need a front-end loader push. Past that, tho, I think that's about it....or at least I hope so. Special message to Burger, Sunil, and Ewest: I spoke again with my fish guy this past Monday....soon come, mahn.