Slick, RT.
Is that the road that the highways guys put in for you for nix?
Yes, the grass grew in the middle of it, doesn't look as good as it did originally, assume it is a bit thin, but it is a very good base for a completed drive some day, and I can't complain about the cost.
Saturday I had a concrete truck pull in. I poured the gate footings and also poured the culvert in front. I used some old I beam I had and welded rebar to it and was planning only to concrete each side that had been washing out. I only did this to be able to get a truck out which has a 4 yard min. After working all day Friday getting it ready I estimnated with the tumbs up method I needed 6 yards. Turned out I kinda over did it. The mud just kept coming out. We had enough to pour 4 inches across the entire 20 ft. Too bad I didn't plan better I would have had steel in place. It will crack eventually but the ends are ancored in good so the I beam can be used to install rails or pour an entire drive in from the pavement eventually.