thanks Chris, I will try the t-posts idea, I have t-posts on both sides at the end of the 45 degree ell and have it tied down with wire over the 45 to keep from "kicking up" but most likely the soil that is over the pipe in the dam will do this but i did this for added insurance.
I will try this also.

JET


Jimmy Terrell (JET)