Chad, I'm wondering if you even need the bucket. Instead, fill the bottom foot or so of the 4" pipe with concrete, and the floating poly pipe should be bouyant enough to keep the trees standing upright. If not, stuffing a chunk of styrofoam in the top of the 4" pipe would keep it standing upright for sure.