It has been a big project. Lots of work, but loads of fun. We increased the depth buy a foot by adding a new stand pipe and increasing the levee height by a foot. The levee was in pretty good shape except for some expected erosion on the inside slope. The new shoreline was also reworked to achieve 4' depth around the entire lake.

original lake bottom with shoreline work in the background


peninsula being built

shoreline excavation


the dead tree will become LMB structure before long!