Glen, one last thing. If you need a dozer man, try Roy Varner out of Ranger, send me an e-mail if you want his phone #. He's doing my Dam and came with excellent references. The down side is that he's out until Fall building lakes in SW Texas, but I doubt you will catch any rainfall until then anyway with the Texas Summer coming. He's done a great job for me so far, clearing, test holes, and laying out options for me. I'm sure terrain plays a part, but $1.10 per cubic yard sounded fine to me. He knows his stuff, I always have research to do after I talk to him, doubt you would be disappointed bringing him in for a look around the place.