These are the work crews double cab duelies, typical construction workers vehicle

Rebar fabrication shop

Crew building column forms

Column forms in the background

Pile, little over 8" square an 16' long

End of pile that was hand chiseled off 16" below grade. Then a 16x16x16" box is poured and that is what supports the column, the fan belts are used to drag them around

Two 6" over flow pipes, I have els that allow for an increase of up to 9 additional inches of water height.

Minor erosion

Major erosion

Looking back with the planted shoal in the foreground