Bill if the clay is in or below the water table You might have to excavate with a track hoe or steam shovel and let it dry out. Then come back with a paddle wheel scraper and spread it out to line the pond. One of the professionals here could probably estimate if that is cheaper than hauling it in. It would probably depend on how far the source is from the job. Either way is costly cause the dirt has to be moved twice rather than once.