|
Forums36
Topics42,113
Posts571,680
Members19,115
| |
Most Online23,413 7 hours ago
|
|
|
|
Joined: Feb 2007
Posts: 26
Lunker
|
|
Lunker
Joined: Feb 2007
Posts: 26 |
I have access to a number of concrete culverts. The only problem is that those suckers are extremely heavy, and my lake has long since been filled up. Does anyone have any bright ideas about how to load them, and then how to get them into the middle of the lake to sink them? I wouldn't think I would need a tractor to do it, or my Ranger to do it, but who knows. Maybe it's a two man job at least.
|
|
|
|
|
Joined: May 2006
Posts: 794
Lunker
|
|
Lunker
Joined: May 2006
Posts: 794 |
How big and heavy? Inner tubes came to mind, say off of a tracter or truck. Depending on the size of the culvert I wonder if you could get them to waters edge and put 2-3 tubes around the culvert then air them up and float them to the area you are wanting them to be planted, then just deflate the tubes, Not sure how you could recover the tubes though, or how much stress the rubber will hold up to but I think it would be fun to try out
A little snow, Please!
|
|
|
|
|
Joined: May 2004
Posts: 14,676 Likes: 509
Moderator Lunker
|
|
Moderator Lunker
Joined: May 2004
Posts: 14,676 Likes: 509 |
How about rolling them down the bank and as far in the water as they go? If they're too shallow, pull them back out and try somewhere else.
"Live like you'll die tomorrow, but manage your grass like you'll live forever." -S. M. Stirling
|
|
|
|
|
Joined: Dec 2006
Posts: 342
Lunker
|
|
Lunker
Joined: Dec 2006
Posts: 342 |
Depending on the size, how would attaching a rope to one, crossing the pond in a boat and attaching the rope to your tractor and then dragging the culvert down the bank and across the bottom to the desired spot? You can then row back to where the culvert was placed and cut the rope.
"Our Life is frittered away by detail. Simplify, Simplify" -Henry David Thoreau -
|
|
|
|
|
Joined: Aug 2006
Posts: 264
Lunker
|
|
Lunker
Joined: Aug 2006
Posts: 264 |
Here's a variation to C1�s idea, run the rope through the culvert and tie it to a section of 4 X 4 with a lighter rope tied to the pulling board and left at the starting point. Pull the culvert to the desired location and retrieve the whole rig back to the start point and start over. That way you won't have any rope debris to hang lures on. I'm in your area and come through Huntsville every week, if you need any help just send me a PM.
Pond Boss subscriber ever since I joined the forum. Thanks Bob!
|
|
|
|
|
Joined: Feb 2007
Posts: 26
Lunker
|
|
Lunker
Joined: Feb 2007
Posts: 26 |
Thanks for the responses gentlemen! Captain1 and FamilyTradition--great idea; think I'm going to try that out, and see where that leaves me. I'm probably going to wait for a little warmer weather next week to do it, but I will report back and let you know how it goes.
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|