|
|
|
Forums36
Topics42,115
Posts571,700
Members19,116
| |
Most Online45,564 Yesterday at 03:05 AM
|
|
|
8 members (Theo Gallus, catscratch, J. E. Craig, gehajake, FishinRod, WindowRock, jludwig, emactxag),
3,169
guests, and
611
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
|
|
Joined: Jun 2003
Posts: 17
Lunker
|
|
Lunker
Joined: Jun 2003
Posts: 17 |
I had a 5-acre lake built last year it is about half way full it probably won�t be filled till next summer. In the mean time I want to protect my emergency spillway from erosion just in case the drop inlet does not handle all the water. It is aprox. 30� wide would it be a good idea to have several truck loads of large rock poured and spread out or have concrete poured? Any input would be great. Thanks: Vincent Murphy
|
|
|
Moderated by Bill Cody, Bruce Condello, catmandoo, Chris Steelman, Dave Davidson1, esshup, ewest, FireIsHot, Omaha, Sunil, teehjaeh57
|
|
|
|