2015 Dam Construction and New Pond - 02/05/15 11:42 PM
I needed to get started on some posts before everything is completed. The dam construction is underway after 3 years of planning, permitting, reading and learning.
Specifics are as follows:
3.5 Acres
18' water Depth
22'overall height
20'emergency spillway 75 feet wide
175 acres drainage
24" riser
18" drain pipe
I will be posting some pictures hopefully quickly but I noticed that the site does not support taptalk for quick upload from mobile devices. Am I missing something here?
Picture of construction with riser just added in today. I hope to backtrack and post all the older pictures.
Specifics are as follows:
3.5 Acres
18' water Depth
22'overall height
20'emergency spillway 75 feet wide
175 acres drainage
24" riser
18" drain pipe
I will be posting some pictures hopefully quickly but I noticed that the site does not support taptalk for quick upload from mobile devices. Am I missing something here?
Picture of construction with riser just added in today. I hope to backtrack and post all the older pictures.