Prepairing stormwater run for Irene - 08/26/11 07:15 PM
Pendot installed a 36inch stormwater drain that flows about 3 acres to my pond. The old drain was 18. I have digging the chanel 2ft wider and 1ft deep because the new water flow blows out and washes everything down hill. The channel runs about 2 acres. I have it halfway down from the road and about 100yards going to the pond. Qustion is I have 4-6 inch limestone, should I fill the channel or just line it? I am just about done putting about 12 inches through the entire channel.