I finished up tack welding the top side of the barge frame.



It takes a lot of clamps to do this kind of work.



This is the beginnings of the battery box.



Next Steps:

1. Weld up the battery box, drill cooling and drain holes, and mount it between the frame rails near the center of the barge frame.
2. Figure out how to tip the frame over to weld the bottom side. The frame is 8 feet wide and the ceiling is less than that, so I will have to move it outside, tip it over and move it back inside. I may need some help!
3. Tip the frame over again to finish welding the top side.


Life is Good on Bremer Pond

Bremer Pond Weather