This morning I cut the perimeter frame members; two 16 footers and two 8 footers, all 45 degree angle cuts. I squared (very basic squaring) it all up on the saw horses with the 90 degree magnets.




That is where I was going to the leave the project until Monday evening after it cools down some.

Resistance was futile; so squared each corner with corner clamps, C-clamps on a heavy angle iron across the corners and the entire low tech welding guy stuff that I know. Then I tack welded it all together. The diagonal corner to corner disparity is under .125".



It was 94 degrees in the shop when I decided to give it a rest. These are the 5 sweatbands I doused this afternoon.


I better replenish my bodily fluids, and now!!


Life is Good on Bremer Pond

Bremer Pond Weather