** 1/28/07 UPDATE ** Brrrr.... It's been 2 weeks since the last pics. It was still raining when we left 2 weeks ago and the level is up about another 10 - 12" or so. From the building site reference point:
- - The water level is now touching the bottom of the concrete boat launch. I know the elevation of this concrete work from last summer. We are about 5'-4" from the spillway. The dry-hydrant intake pipe is also submerged...or should I say frozen? The Rockytopper Lunker Stopper tire array in front of the launch dock is gone. - -
- Theo's Cluster is definitely threatened. Sunil's Mound is pert-near a goner. The Wood Duck nesting boxes beckon me to enjoy cold, dry land and install the predator guards...NOW.