I worked up the gumption yesterday to put a couple cubic yards of cobble down along the pond bank. This is the main gulley wash water collector spot, and was experiencing some noticeable erosion from the rainfall runoff. I heaped it up a foot or so from grade, and will come behind it with some smaller material to fill the gaps a bit. Hopefully it will stop the bank from cutting further, and collect some sediment that comes with a toad strangler.