Had another 25 ton load of 3x6 crushed limestone delivered this morning.

The last load covered ~2' above and below the full pool water line on the dam.
After eyeballing it for a few weeks I decided that more coverage below the water line would be a good thing.

I wonder how long it will take to hand toss 25 ton into the drink?