Originally Posted By: jimwaltman
i have a hole (have pics dont know how to download them) in my dam from beavers. Thinking about putting used chainlink down without post. How do i keep them flat and in place


Take #3 or #4 rebar. Heat or otherwise bend the end so it looks like an upside down J. Leave the long part 12"-18" or so long, the short part 3"-4". Use those as "staples" to hold the chain link in place like tent stakes except pound them all the way into the ground. If it was mine, I'd start at the top and bottom corners, and put a staple every 6'-8' along the edge.


www.hoosierpondpros.com


http://www.pondboss.com/subscribe.asp?c=4
3/4 to 1 1/4 ac pond LMB, SMB, PS, BG, RES, CC, YP, Bardello BG, (RBT & Blue Tilapia - seasonal).