Originally Posted By: Brad346
That seems like a lot of dirt. What are the contour intervals? How long is it and how wide do you want the top?

Rainman, Really? $200 dollars per cubic yard of dirt? My concrete guy charges $300 a yard and that includes forming and rebar.


There is a wide range per cubic yard...$40-$200. If all the dirt needed is in the basin with gentle slopes, you will be in the low range. If sides are steep, dirt has to be dug borrow pits, smooth and landscape the dig, and then wheelbarrow the dirt to the dam, you'll be on the high end.....