It has been a long time, but I didn't completely give up on this project. Just got delayed some.

The contractor whose engineer drew up the plans for this, kept putting me off, wouldn't even give a quote for the cost. Each time I'd call, the number of jobs he told me were ahead of me kept growing, but he would always promise to get to it in a month or two. lol

I finally gave up on him and got the first contractor I contacted, to take the job. I think the engineer's plans helped this time, because he is a one man operation, and it is a bit overwhelming to plan everything from scratch.

Will update with some pictures soon.

Last edited by NancyGA; 02/13/19 08:50 AM.