Fishhead,
I like the idea of running 10" through the existing pipe. I would suggest running the 10" the full length of the existing pipe and cementing it in. Your existing corrugated metal pipe is probably starting to rust out. This would give it a permanent fix. Then go ahead with the siphon off of the 10"


Make it look easy,
http://zhkent.com