Originally Posted By: ewest
I is good where it is.

Lots of structure. Do you have all depths covered with structure (surface to bottom)?

I like the groping of structure in groups of 3 or 4 like you used. Always remember with structure placement to think in the vertical dimension as well. Also don't put structure where it will impede emergency outflow.


FH can do well in poor water conditions.


Do you have questions? Make a map of structure post full pool.


On the north and south end I have vertical structure that'll reach to about 2-3 feet from the surface.

The question I had was about my stocking plan and if the BG population will be big enough in 12 months to sustain the LMB and HSB that I put in.


Cheers!