Well we cut through the tile in two spots with the surface of the ground above the full pool height. This is with the hopes when we put pressure on that tile the water will not come up to the surface.

The hope is that the tile being cut in two more spots will hold the pressure back and the leak will seal in time.

Question is now that I let the pond leak down as much as we could. When we cut through the tile the hole filled instantly to the ponds water level. Then we had to fill the hole in and pack it just with the tracks of the miniEx.

Should I fill the pond now right after the dig or just leave it for the winter where the water level is?

Thanks Don.


[Linked Image from corvettejunkie.com]
http://www.pondboss.com/subscribe.asp?c=4


7/8th of an acre, Perch only pond, Ontario, Canada.