Originally Posted By: Mike Whatley
I hadn't thought of that, John, but that's very doable. Did you tie around the diameter of the pipe or pass through the length. I'm thinking if around the diameter closer to one end, it would allow the culvert to turn a little to point down hill. Or would it be better to have it stay parallel?

Catfish or not, those culverts will be good cover and hard structure.


Passed through the length.