Here is last night's progress.



A little background on the design...The blue barrels float the gangway a little high. I have left access to the bungs so that I can add water if need be to sink that end a little. If you look close on the shore side of the blue barrels, I have a place for two more barrels just in case the first two needed some help. Well they don't so I will remove some of that extra work with added extra work. I did not want to need the extra barrels and have to construct the supports on the water, now I get to dismantle those supports on the water(no big deal). I may find that after I add the weight of the gangway decking that it levels out and I don't have to add any water, but we'll see.

It's a little wobbly at this point, but the connections between the 3 outer frames has not been tightened up yet and the decking will surely add some rigidity to it.