Getting closer to moving hopefully MARCH 2018. The fireplace mantle is a railroad tie I pressure washed and stainedit with rose flame oil. Drove the spikes and polished . Door is trimmed out in red oak it was a first for our builder we loved it, my wife and I stained it and sealed. The ceiling is the kitchen .

Attached Images
20180111_173429-1512x2016-1134x1512.jpg 8274-399x710.jpg 10126-1125x1500-562x749.jpg 10081-480x640-360x480.jpg