I have worked in a killer deal for 475 tons of riprap being installed. They are gonna excavate a 1ft deep by 4ft trench around the water line and dump the rip rap in. But I can have them widen it if I need to.

Questions:

How far above full pool level should I have rock exposed?

And how deep should it go?

Thanks.